Another Take on the Five Orders of Ignorance

 

I came across a post this weekend about different types of knowledge It’s a well written post that calls out one of my favorite topics – you don’t know what you don’t know. I think the Five Orders of Ignorance (or my tribute to the five orders here) are brilliant, and the author nails Armour’s zero, first, and second level ignorance with his take on knowledge (described as “shit you know, shit you don’t know, and shit you don’t know you don’t know). 20I (read two-oh-eye) – what you don’t know you don’t know (aka the unknown unknowns) are a big reason why we suck at scheduling. Think about it – when we throw out estimates for how long a particular task will take, it’s often half guess, and half padding because we know “stuff” will come up (yes, there’s a lot we can do to make scheduling more accurate too, but that’s a topic for another day).

IMO, there are two pretty big things missing from this article. The first is a discussion of suitable methods to determine what we don’t know we don’t know (aka Armour’s 30I). A passion for learning, critical thinking (and the knowledge or acknowledgement of 20I) all help us identify and solve the unknown unknowns. The way we learn is to discover what we don’t know we don’t know, make it something we (just) don’t know, then make it something we know. We move knowledge down through the orders of ignorance – without a method for discovering what we don’t know we don’t know, it’s just a problem that we’ll never solve (or never know about). For some, I suppose that’s fine, but not for people who are interested in learning.

The second point is that the author doesn’t acknowledge Armour. What’s great about this is that I don’t think it was on purpose – I’m pretty sure the author just didn’t know that Armour had already discussed the same topic in depth. The unknown unknown’s will get you every time!

Similar Posts

  • Upcoming stuff

    If you’re interested in stalking me, here are some places I’ll be in the coming months. On October 18th, I’ll be talking about code reviews at the Pacific Northwest Software Quality Conference. If you want to catch me there, you better catch me on the 18th, because I’m flying to Toronto on October 19th to…

  • Five for Friday – October 5, 2018

    Here are a few (five, actually) things I saw this week and liked. This quote from Jim Whitehurst is good leadership advice. “People working in today’s information-rich, dynamic contexts don’t need leaders who think they know everything about prescribing the “best” paths forward. They need leaders who help them sit more comfortably (and sleep more…

  • |

    Five for Friday – May 4, 2018

    It’s Star Wars Day! Here’s what I found interesting this week. Quote I’m pondering (or quote within a quote, as it’s the authors of The Coaching Habit who are quoting Bernard Shaw): “Bernard Shaw put it succinctly when he said, “The single biggest problem with communication is the illusion that it has taken place.” Book…

  • Tear Down the Wall

    It’s interesting when I go back and look at the number of posts where I talk about what I do, what testing is to me, and how testing is changing. Ever since the Telerik Test Summit (telsum), I’ve been thinking even more about testing and how it fits into software development. When I wrote this…

  • The Breakup

    This one goes out to the one I love. This one goes out to the one I left behind -REM Relationships are both challenging and rewarding. As adults, we’ve all gone through dozens of relationships – some short, some long, some very long. They all have their ups and downs; their ebbs and flows; and…

One Comment

  1. regarding ” it’s often half guess, and half padding” — yet, most project estimates need to be to 5 or 10% acceptance level. However, with the right tools and experience, one may learn to estimate as appropriate to that level. Often, half padding is not a good idea which perhaps may mislead for future estimation exercise. However, isn’t it ideal to estimate to closest acceptance level to the best of knowledge and learn the risk mitigation approach for assumptions, possible unknowns and pad accordingly? This comes challenging for most date driven projects where date is not flexible in the tripple contraints.

    regarding “second point is that the author doesn’t acknowledge Armour” — perhaps the 5OI – in the context of being ignorant of this topic was discussed before. I have read about about a similar order of ignorance in the context of feedback mechanism – where learning is still a key attribute

    thank you for the link levels of Ignorance article.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.